|
M
& I AIR MIXER
| M
& I AIR VALVE | M&I
COLUMN FAN/COMPUTER ROOM AIR CONDITIONER
M&I
COMPAC SPACE FAN SYSTEM | M&I
WHISPER-AIR FAN SYSTEM | M&I INDUCTION
UNIT
This is a partial list of some of our clients who are using air handling and distribution systems designed and manufactured by M & I Air Aystems.
M
& I AIR MIXER
PARTIAL INSTALLATION LIST
| 1. |
Project: |
University of Michigan Hospital, Ann Arbor, MI |
| |
Mech. Eng.: |
John E. Green |
| |
Capacity: |
28,000 cfm |
| 2. |
Project: |
Nashville Public Library, Nashville, TN |
| |
Mech. Eng.: |
I.C. Thomason |
| |
Capacity: |
One 94,465 cfm and One 124,200 cfm |
| 3. |
Project: |
Progressive Campus II, Cleveland, OH |
| |
Mech. Eng.: |
The Whiting-Turner |
| |
Capacity: |
Two 90,000 cfm each |
| 4. |
Project: |
Providence Hospital, Anchorage, AK |
| |
Mech. Eng.: |
Coffman Engineer |
| |
Capacity: |
One 110,000 cfm and one 65,000 cfm |
M & I AIR VALVE
| 1. |
Project: |
Rutger University, Denville, NJ |
| |
Mech. Eng.: |
Kallen & Lemelson, NY |
| 2. |
Project: |
University of Iowa, IA; Chemistry & Botany Bldg. |
| |
Mech. Eng.: |
KJWW Eng. Consultants, Rock Island, IL |
| 3. |
Project: |
Imperial Chemical Company, England |
| |
Customer: |
Ensertec Systems International Ltd. |
| 4. |
Project: |
Motorola Inc., AZ |
| |
Mech. Eng.: |
Beu-Math Engineers |
| 5. |
Project: |
Crete Monee School, IL |
| |
Mech. Eng.: |
J.L.S. Consulting Services |
| 6. |
Project: |
Shelter Insurance Co., MO |
| |
Customer: |
Econair Inc. |
| 7. |
Project: |
Wyeth Lab, NJ |
| |
Customer: |
R.H. Morris & Associates |
| 8. |
Project: |
W.R. Grace, Maryland |
| |
Customer: |
The Dexter Company |
| 9. |
Project: |
Medical Biological Research Lab, Fort Dietrick,
MD |
| |
Mech. Eng.: |
U.S.A. Government |
| 10. |
Project: |
Wellman Inc., SC |
| |
Customer: |
Stipp & Powell |
| 11. |
Project: |
Henkel Lab, NJ |
| |
Customer:
|
Steve Mucha Inc. |
| 12. |
Project: |
General Dynamics |
| |
Customer:
|
Marshall/TRIM-Aire |
| 13. |
Project: |
Iomega, Salt Lake City, UT |
| |
Customer:
|
Sabol & Rice Inc. |
| 14. |
Project: |
J.H. Kawa Sake Motors |
| |
Customer: |
Air Conditioning Special |
| 15. |
Project: |
Rutger University, NJ |
| |
Customer: |
R.H. Morris |
| 16. |
Project: |
Shelter Insurance Co., MO |
| |
Customer: |
Econair Inc. |
| 17. |
Project: |
Westwood Hospital, CA |
| |
Customer: |
Air Conditioning Spec. Comp. |
| 18. |
Project: |
Congress Centre |
| |
Customer: |
Thermo Dynamics Inc. |
| 19. |
Project: |
E.M Diagnostics, NJ |
| |
Customer: |
Harris Environmental Systems |
| 20. |
Project: |
Washington University, MO |
| |
Customer: |
C&R Heating & Services Co |
| 21. |
Project: |
Westwood Hospital, CA |
| |
Customer: |
Imperial Air Conditioning |
| 22. |
Project: |
Crete Monee High School, IL |
| |
Customer: |
Havel Brothers Inc. |
| 23. |
Project: |
Plymouth Vocational High School, MA |
| |
Customer: |
Worcester Air Conditioning Co. Inc. |
| 24. |
Project: |
Bill Moore, FL |
| |
Customer: |
Harlow & Associates |
| 25. |
Project: |
Motorola, AZ |
| |
Customer: |
Pacific Air Reps |
| 26. |
Project: |
Maurice-Lamontagne Lab. Institutes, PQ |
| |
Customer: |
Tranchair J.F. Inc. |
| 27. |
Project: |
Sussex Place, ON |
| |
Mech. Eng: |
Smylie & Crow Associates |
| 28. |
Project: |
Nashville Convention Centre, TN |
| |
Customer: |
Smith Seckmen Reid Inc., TN |
| 29. |
Project: |
University of Michigan (Laboratory) |
| |
Customer: |
Phoenix Controls Corporation |
| 30. |
Project: |
Boston University, MA |
| |
Customer: |
Leonard F. Luchner, Inc. |
| 31. |
Project: |
Animal Disease Diagnostic Laboratory, IN |
| |
Customer: |
Havel Bros. Inc. |
| 32. |
Project: |
Sandoz Pharmaceutical, NJ |
| |
Customer: |
Monsen Engineering Co. |
| 33. |
Project: |
Flow Safe Control, NJ |
| |
Customer: |
Through Flow Safe Control,
M&I have supplied air valves to more than 50
laboratory fume hood projects. |
M&I COLUMN FAN/COMPUTER ROOM AIR CONDITIONER
PARTIAL INSTALLATION LIST
| 1. |
Project: |
Woodfield Preserve Office Center, Chicago, IL |
| |
Mech. Eng.: |
ESD |
| |
Capacity: |
Twenty Four (24) 10,000 cfm |
| 2. |
Project: |
Pine Meadows Corporate Center, Liberville, IL |
| |
Mech. Eng.: |
ESD |
| |
Capacity: |
Twenty Four (24) 10,000 cfm |
| 3. |
Project: |
US West Main - 10th Floor, Denver, CO |
| |
Mech. Eng.: |
US Engineering Company |
| |
Capacity: |
Four (4) 10,000 cfm & One (1) 6,100 cfm |
M&I COMPAC SPACE FAN SYSTEM
PARTIAL INSTALLATION LIST
| 1. |
Project: |
Downers Grove Wastewater Treatment
Center, IL |
| |
Mech. Eng.: |
Baxter & Woodman, IL |
| |
Capacity: |
Five 5,000 to 7,500 cfm exhaust |
| 2. |
Project: |
Cincinnati Medical Arts Building,
OH |
| |
Mech. Eng.: |
I.C. Thomasson, TN |
| |
Capacity: |
One 125,000 cfm supply |
| 3. |
Project: |
J.J. Keller Office Building |
| |
Mech. Eng.: |
Walter R. Ratai Inc., WI |
| |
Capacity: |
One 90,000 cfm supply & one 81,000 cfm return |
| 4. |
Project: |
Vanderbilt University, TN |
| |
Mech. Eng.: |
Smith Seckman & Reid, TN |
| |
Capacity: |
One 75,000 cfm supply & 45,000 cfm return |
| 5. |
Project: |
Hamilton East End Police Station |
| |
Mech. Eng.: |
Group 8 Engineers, Ontario |
| |
Capacity: |
One 25,000 cfm supply and one 13,000 cfm
supply |
| 6. |
Project: |
Motorola Inc., (MOS 8), Austin,
TX |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
One 95,000 cfm supply |
| 7. |
Project: |
Nuclear Power Plant, India |
| |
Mech. Eng.: |
Indian Automatic Energy Commission |
| |
Capacity: |
Sixteen 23,500 cfm and eight 13,000 cfm
supply |
| 8. |
Project: |
Centennial Hospital (Hospital
Corporation of America) |
| |
Mech. Eng.: |
I.C. Thomasson, TN |
| |
Capacity: |
Five supply (372,000 cfm) and five return
(304,000 cfm) |
| 9. |
Project: |
Medical Research Building (Vanderbilt
University) |
| |
Mech. Eng.: |
Phoenix Consulting Engineers |
| |
Capacity: |
Two 130,000 cfm supply and one 54,000 cfm
supply |
| 10. |
Project: |
Motorola Inc. (Disco Polyimide)
Austin, TX |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
Three 25,000 cfm supply |
| 11. |
Project: |
Cyanamid/Lederle Labs (Bldg.
#34), NY |
| |
Mech. Eng.: |
Fletcher Thompson |
| |
Capacity: |
One 18,000 cfm supply |
| 12. |
Project: |
Motorola Inc. (D-Building) Austin,
TX |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
One 25,000 cfm supply |
| 13. |
Project: |
Motorola Inc., Austin TX |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
One 95,000 cfm supply |
| 14. |
Project: |
Motorola Inc. (K-Probe), Austin,
TX |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
Five 25,000 cfm supply |
| 15. |
Project: |
Library Square Parkade, Vancouver,
B.C. |
| |
Mech. Eng.: |
Keen Engineering |
| |
Capacity: |
Three supply (27,000 cfm) and four exhaust
(191,000 cfm) |
| 16. |
Project: |
Cyanamid/Lederle Labs (Building
#43), NY |
| |
Mech. Eng.: |
A&J Consultants |
| |
Capacity: |
One 21,600 cfm supply |
| 17. |
Project: |
Cyanamid/Lederle Labs (Building
#112), NY |
| |
Mech. Eng.: |
JGS Technical Services |
| |
Capacity: |
One 20,000 cfm supply |
| 18. |
Project: |
Cyanamid/Lederle Labs (SPE-Phase
3), NY |
| |
Mech. Eng.: |
GS&G |
| |
Capacity: |
One 21,000 cfm supply |
| 19. |
Project: |
Cyanamid/Lederle (Bldg. 43B,
Chillroom 142) |
| |
Mech. Eng.: |
A&J Consulting |
| |
Capacity: |
One 18,000 cfm supply & 17,000 cfm return |
| 20. |
Project: |
Library Square Parkade, Vancouver,
BC |
| |
Mech. Eng.: |
Keen Engineering |
| |
Capacity: |
One 84,000 cfm supply |
| 21. |
Project: |
Motorola, Austin, TX (*) |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
Five 95,000 cfm supply |
| 22. |
Project: |
Cyanamid/Lederle Labs (Building
#120), NY |
| |
Mech. Eng.: |
Lederle Engineering |
| |
Capacity: |
One 30,000 cfm booster fan system |
| 23. |
Project: |
IBM, Burlington, VT (*) |
| |
Mech. Eng.: |
IBM Engineering |
| |
Capacity: |
One 12,500 cfm return |
| 24. |
Project: |
Maintenance Bldg., Redwood City,
CA |
| |
Mech. Eng.: |
Westcon Associates |
| |
Capacity: |
One 12,500 cfm supply |
| 25. |
Project: |
Newington Childrenís Hospital,
CT |
| |
Mech. Eng.: |
Smith Seckman Reid |
| |
Capacity: |
Three supply (342,000 cfm) and three return
(273,000 cfm) |
| 26. |
Project: |
Vanderbilt Univ.-McDonalds Rest.,
Nashville, TN |
| |
Mech. Eng.: |
Smith Seckman & Reid, TN |
| |
Capacity: |
One 18,000 cfm supply |
| 27. |
Project: |
Motorola Austin, TX (*) |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
Four 25,000 cfm and two 48,000 cfm supply |
| 28. |
Project: |
Nashville Arena, Nashville, TN |
| |
Mech. Eng.: |
Smith Seckman & Reid, TN |
| |
Capacity: |
Six 75,000 cfm supply and three 200,000
cfm return |
| 29. |
Project: |
Cyanamid/Lederle Labs (Autoclave
Bldg.), NY |
| |
Mech. Eng.: |
A&J Consulting |
| |
Capacity: |
One 3,000 cfm supply |
| 30. |
Project: |
EMC Expansion, IA |
| |
Mech. Eng.: |
Brooks Borg and Skiles |
| |
Capacity: |
One 160,000 cfm supply and one 144,000 cfm
return |
| 31. |
Project: |
University of Michigan, Holden
Central, MI |
| |
Mech. Eng.: |
Keen Engineering |
| |
Capacity: |
One 30,000 cfm supply and one 23,000 cfm
return |
| 32. |
Project: |
Roseville Hospital, CA |
| |
Mech. Eng.: |
Smith Seckman Reid |
| |
Capacity: |
One 138,000 cfm supply and one 97,100 cfm
return |
| 33. |
Project: |
Washington State University,
WA |
| |
Mech. Eng.: |
Thomas J. Gerard & Associates |
| |
Capacity: |
One 75,000 cfm supply |
| 34. |
Project: |
IBM, Burlington, VT(*) |
| |
Mech. Eng.: |
Symmes, Maini & McKee Associates Inc. |
| |
Capacity: |
One 50,000 cfm supply |
| 35. |
Project: |
Merck Pharmaceutical, NJ |
| |
Mech. Eng.: |
IPS |
| |
Capacity: |
One 26,935 cfm supply |
| 36. |
Project: |
Lederle Labs (Bldg. 60/60B),
NY |
| |
Mech. Eng.: |
Fluor Daniel |
| |
Capacity: |
One 28,800 cfm supply and one 22,500 cfm
return |
| 37. |
Project: |
Motorola Inc., Austin TX (*) |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
One 48,000 cfm supply |
| 38. |
Project: |
CCMC Campus Shell, CA |
| |
Mech. Eng.: |
C&B Consulting Engineers |
| |
Capacity: |
Two 45,000 cfm supply |
| 39. |
Project: |
Lederle Labs (Bldg. 211), NY |
| |
Mech. Eng.: |
John Brown Engineers, NY |
| |
Capacity: |
Three return (71,000 cfm) and two exhaust
(50,300 cfm) |
| 40. |
Project: |
Lederle Labs (Bldg. 211), NY |
| |
Mech. Eng.: |
John Brown Engineers, NY |
| |
Capacity: |
One 36,000 cfm supply and one 16,000 cfm
supply |
| 41. |
Project: |
IBM - Toshiba, Manassas, VA
(*) |
| |
Mech. Eng.: |
IDC Engineers, PA |
| |
Capacity: |
Fifty three recirculation AHUís (1,900,000
cfm) |
| 42. |
Project: |
Northwestern University, IL |
| |
Mech. Eng.: |
- |
| |
Capacity: |
Capacity : Two 58,000 cfm exhaust |
| 43. |
Project: |
Merck & Co. Inc., PA |
| |
Mech. Eng.: |
IPS Consultants |
| |
Capacity: |
One 20,000 cfm supply and one 2,000 cfm
supply |
| 44. |
Project: |
Edmonds Community College, WA |
| |
Mech. Eng.: |
Halverson, Beach and Bower, Inc. |
| |
Capacity: |
Two 27,000 cfm supply and two 23,500 cfm
return |
| 45. |
Project: |
HCSC Blue Cross/Blue Shield,
IL |
| |
Mech. Eng.: |
Cosentini Associates |
| |
Capacity: |
Four 174,000 cfm supply and four 145,000
cfm return |
| 46. |
Project: |
Washington State University,
WA |
| |
Mech. Eng.: |
Thomas J. Gerardís Associates |
| |
Capacity: |
One 75,000 cfm supply |
| 47. |
Project: |
Princeton University, NJ |
| |
Mech. Eng.: |
R.G. Vanderweil Engineers |
| |
Capacity: |
One 25,000 cfm supply |
| 48. |
Project: |
Lederle Labs, Bldg. 60 / 60B,
NY |
| |
Mech. Eng.: |
Fluor Daniel |
| |
Capacity: |
One 31,000 supply and return, one 32,500
supply & return |
| 49. |
Project: |
Vanderbilt University, TN |
| |
Mech. Eng.: |
Smith Seckman Reid |
| |
Capacity: |
One 40,000 cfm supply and 40,000 cfm return
|
| 50. |
Project: |
Kellogg Institute, MI |
| |
Mech. Eng.: |
Giffels Associates |
| |
Capacity: |
Three 40,000 cfm supply and one 120,000
cfm return |
| 51. |
Project: |
Mayo Hospital, AZ |
| |
Mech. Eng.: |
Phoenix Design Group |
| |
Capacity: |
Seven Supply (551,200 cfm) and Seven Return
(430,900 cfm |
| 52. |
Project: |
Wyeth Lederle, PA |
| |
Mech. Eng.: |
IPS Consultants |
| |
Capacity: |
One 35,000 cfm supply |
| 53. |
Project: |
Amoco Business Center, IL |
| |
Mech. Eng.: |
Melvin Cohen and Associates |
| |
Capacity: |
Two 120,000 cfm supply and two 120,000 cfm
return |
| 54. |
Project: |
Vitesse Fab 2, AZ (*) |
| |
Mech. Eng.: |
Symmes Maini McKee Associates |
| |
Capacity: |
Twelve 106,300 cfm supply |
| 55. |
Project: |
University of Florida Brain Center,
FL |
| |
Mech. Eng.: |
Affiliated Engineers |
| |
Capacity: |
Four supply (162,000 cfm) and one 34,000
cfm return |
| 56. |
Project: |
Jackson Hospital, Montgomery,
AL |
| |
Mech. Eng.: |
Phoenix Design Group |
| |
Capacity: |
One 88,900 cfm supply/return, one 71,600
supply/return |
| 57. |
Project: |
Center For Creative Leadership,
Greensboro, NC |
| |
Mech. Eng.: |
Calloway Johnson Moore and West, PA |
| |
Capacity: |
One 80,000 cfm supply |
| 58. |
Project: |
Hattie B. Monroe Bldg., Omaha,
NE |
| |
Mech. Eng.: |
Farris Engineering |
| |
Capacity: |
One 30,000 cfm supply |
| 59. |
Project: |
Centertech, Denver, CO |
| |
Mech. Eng.: |
A.B.S. |
| |
Capacity: |
Two 102,500 cfm supply |
| 60. |
Project: |
Sandia CRF, San Francisco, CA |
| |
Mech. Eng.: |
Affiliated Engineers |
| |
Capacity: |
Five 25,600 cfm supply and one 125,000 cfm
supply |
| 61. |
Project: |
University of Illinois, Ambulatory
Care, Chicago, IL |
| |
Mech. Eng.: |
Perkins and Will |
| |
Capacity: |
One 140,000 cfm supply/return and one 120,000
cfm supply/return |
| 62. |
Project: |
Motorola, Austin, TX (*) |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
Two 95,000 cfm supply |
| 63. |
Project: |
Motorola, Austin, TX (*) |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
One 25,000 cfm supply |
| 64. |
Project: |
Baptist Hospital, Nashville,
TN |
| |
Mech. Eng.: |
Smith Seckman Reid |
| |
Capacity: |
One 140,000 cfm supply and one 120,000 cfm
return |
| 65. |
Project: |
Oriental Theater, Chicago, IL |
| |
Mech. Eng.: |
Environmental Systems Design, Inc. |
| |
Capacity: |
One CS-65,000 supply and one CS-34,140 cfm
supply |
| 66. |
Project: |
Library, 3rd Floor, Rochester,
NY |
| |
Mech. Eng.: |
Corning Engineering |
| |
Capacity: |
50,000 cfm return |
| 67. |
Project: |
Motorola, Austin, TX (*) |
| |
Mech. Eng.: |
Motorola Engineering |
| |
Capacity: |
Three 95,000 cfm each |
| 68. |
Project: |
U.C. Davis Equine Lab, San Francisco,
CA |
| |
Mech. Eng.: |
Affiliated Engineers |
| |
Capacity: |
Two 25,000 cfm supply |
| 69. |
Project: |
Longmont Hospital, Longmont,
CO |
| |
Mech. Eng.: |
Barbalata, Cordero, Espinosa, Robinson |
| |
Capacity: |
Two 84,000 cfm each supply |
| 70. |
Project: |
Corning Corporation, Corning,
NY |
| |
Mech. Eng.: |
Corning Corp. |
| |
Capacity: |
One 50,000 cfm return |
| 71. |
Project: |
Prime Meadows Corporation Center,
Libertiville, IL |
| |
Mech. Eng.: |
Wagner Heating & Ventiliating |
| |
Capacity: |
Twelve 9,400 cfm units |
| 72. |
Project: |
Sandia National Laboratories,
Albuquerque, NM |
| |
Mech. Eng.: |
BPLW Architects & Engineers |
| |
Capacity: |
One 41,000 cfm supply |
| 73. |
Project: |
199 Freemont St., San Francisco,
CA |
| |
Mech. Eng.: |
Flack & Kurtz |
| |
Capacity: |
One 35,000 cfm supply |
| 74. |
Project: |
Gap Headquarters, San Francisco,
CA |
| |
Mech. Eng.: |
C&B Engineers |
| |
Capacity: |
Six 85,000 cfm supply |
| 75. |
Project: |
Lucent Technologies, Denver,
CO (*) |
| |
Mech. Eng.: |
Swanson Rink |
| |
Capacity: |
Fifteen supply (921,500 cfm) and twelve
return (511,500 cfm) |
| 76. |
Project: |
Woodfield Preserve Office Center,
Chicago, IL |
| |
Mech. Eng.: |
Hill Mechanical |
| |
Capacity: |
Twenty four 9,000 cfm supply |
| 77. |
Project: |
EDD Office Building, San Francisco,
CA |
| |
Mech. Eng.: |
Mazzetti & Associates |
| |
Capacity: |
One 64,000 cfm supply |
| 78. |
Project: |
Baptist East-West Bedtower,
Memphis, TN |
| |
Mech. Eng.: |
Phoenix Design Group |
| |
Capacity: |
One 77,000 cfm supply, one 32,000 cfm exhaust |
| 79. |
Project: |
Nashville Public Library, Nashville,
TN |
| |
Mech. Eng.: |
I.C. Thomasson |
| |
Capacity: |
Two 222,105 cfm supply and two 201,305 cfm
return |
| 80. |
Project: |
The Progressive Insurance Campus
II, Cleveland, OH |
| |
Mech. Eng.: |
Bacik, Karpinski Asssociates, Inc. |
| |
Capacity: |
Two 90,000 cfm supply and two 90,000 cfm
return |
| 81. |
Project: |
Pier 1, San Francisco, CA |
| |
Mech. Eng.: |
Flack & Kurtz |
| |
Capacity: |
Four 15,000 cfm exhaust |
| 82. |
Project: |
Edmonds Community Center, Seattle,
WA |
| |
Mech. Eng.: |
Nardone Mechanical |
| |
Capacity: |
One 19,670 cfm supply and one 17,500 cfm
return |
| 83. |
Project: |
Bell South Marietta, Atlanta,
GA |
| |
Mech. Eng.: |
Johnson, Spellman & Associates, Inc. |
| |
Capacity: |
Two 18,760 cfm supply |
| 84. |
Project: |
Good Samaritan Hospital, Puyallup,
WA |
| |
Mech. Eng.: |
Wood/Harbinger Inc. |
| |
Capacity: |
Two 40,000 cfm supply and two 40,000 cfm
return |
| 85. |
Project: |
Cornell University, Ithica,
New York |
| |
Mech. Eng.: |
Charles Wilson Associates |
| |
Capacity: |
Two 35,000 cfm exhaust |
| 86. |
Project: |
Providence Medical Center, Anchorage,
AK |
| |
Mech. Eng.: |
Coffman Engineers |
| |
Capacity: |
Two supply (175,000 cfm) and two return
(115,000 cfm) |
* Cleanroom applications - November/2000
M&I WHISPER-AIR FAN
SYSTEM
PARTIAL INSTALLATION LIST
| 1. |
Project: |
Vanderbilt University, Nashville,
TN |
| |
Mech. Eng.: |
Phoenix Design Group |
| |
Capacity: |
One 8,300 cfm supply and return |
| 2. |
Project: |
Wyeth-Ayerst Labs, Marietta,
PA |
| |
Mech. Eng.: |
IPS |
| |
Capacity: |
One 35,000 cfm return |
| 3. |
Project: |
Oakland Arena, Oakland, CA |
| |
Mech. Eng.: |
Scott Norman Mechanical Inc. |
| |
Capacity: |
Four 70,000 cfm supply |
| 4. |
Project: |
Sony Entertainment Center, San
Francisco, CA |
| |
Mech. Eng.: |
S.J. Engineers |
| |
Capacity: |
Fourteen 15,000 cfm to 33,000 cfm relief |
| 5. |
Project: |
UNC-G School of Music, Greensboro,
N.C |
| |
Mech. Eng.: |
McCracken and Lopez |
| |
Capacity: |
One 23,200 cfm supply and return |
| 6. |
Project: |
University of Michigan, Ann Arbor,
MI |
| |
Mech. Eng.: |
University of Michigan Engineering |
| |
Capacity: |
One 30,000 cfm supply, one 45,000 cfm supply
and one 60,000 cfm supply |
| 7. |
Project: |
MEMC Electronic Materials, Inc.,
St. Peters, MO |
| |
Mech. Eng.: |
Burns & McDonnell |
| |
Capacity: |
One 42,000 cfm supply |
| 8. |
Project: |
Department of Revenue, Minneapolis,
MN |
| |
Mech. Eng.: |
Hammel Green & Abrahamson Inc. |
| |
Capacity: |
Four 96,000 cfm supply |
| 9. |
Project: |
Elmhurst Memorial Hospital, Chicago,
IL |
| |
Mech. Eng.: |
Phoenix Design Group |
| |
Capacity: |
Four 48,000 cfm supply and return |
| 10. |
Project: |
Wright Corporation Development
Lab, Ridgewood, NC |
| |
Mech. Eng.: |
David Sims & Assoc. |
| |
Capacity: |
One 8,500 cfm supply |
| 11. |
Project: |
Holy Cross Health System Corp.
Headquarters, South Bend, IN |
| |
Mech. Eng.: |
Hammel Green and Abrahamson Inc. |
| |
Capacity: |
Two 42,500 cfm supply and one 13,500 cfm
supply |
| 12. |
Project: |
: Womanís Pavillion, Florence,
SC |
| |
Mech. Eng.: |
- |
| |
Capacity: |
Three supply / return systems with 81,800
cfm total |
| 13. |
Project: |
Clariant Corp. Branchburg, N.J |
| |
Mech. Eng.: |
Foster Wheeler |
| |
Capacity: |
One 10,000 cfm supply |
| 14. |
Project: |
NIH NMR Addition, Washington,
DC |
| |
Mech. Eng.: |
RMF |
| |
Capacity: |
Two 15,000 cfm supply |
| 15. |
Project: |
Atlanta Arena, Atlanta, GA |
| |
Mech. Eng.: |
M-E Engineers |
| |
Capacity: |
Two 99,000 cfm supply and two 81,000 cfm
supply |
| 16. |
Project: |
Limestone Meadowbrook, Syracuse,
N.Y. |
| |
Mech. Eng.: |
Limestone Meadowbrook |
| |
Capacity: |
One 14,000 cfm supply |
| 17. |
Project: |
Nelson Hall, Durham, NC |
| |
Mech. Eng.: |
Davis Campus Architects & Engineers |
| |
Capacity: |
9,000 cfm supply |
| 18. |
Project: |
Institute of Genomic Research,
Rockville, MD |
| |
Mech. Eng.: |
RMF |
| |
Capacity: |
One 50,000 cfm supply |
| 19. |
Project: |
Institute of Genomic Research,
Rockville, MD |
| |
Mech. Eng.: |
RMF Engineering |
| |
Capacity: |
Four supply systems (11,000 cfm to 15,000
cfm ea.) |
| 20. |
Project: |
Nations Bank |
| |
Mech. Eng.: |
Columbia Mechanical |
| |
Capacity: |
One 7,000 cfm supply |
| 21. |
Project: |
DLJ, 36th Floor, New York, NY |
| |
Mech. Eng.: |
Cosentini Associates |
| |
Capacity: |
One 17,500 systems |
| 22. |
Project: |
Clariant Corp. Branchburg, N.J |
| |
Mech. Eng.: |
Foster Wheeler |
| |
Capacity: |
One 10,000 cfm supply |
| 23. |
Project: |
Jordan Valley Hospital, Salt
Lake City, UT |
| |
Mech. Eng.: |
ESCO Mechanical & Electrical |
| |
Capacity: |
Five systems with 83,000 cfm total capacity
|
| 24. |
Project: |
New York Hospital, Hicksville,
NY |
| |
Mech. Eng.: |
CIMA Group |
| |
Capacity: |
One 36,800 cfm supply |
| 25. |
Project: |
DLJ, 43rd Floor, New York, NY |
| |
Mech. Eng.: |
Cosentini Associates |
| |
Capacity: |
One 17,500 cfm supply |
| 26. |
Project: |
Memorial Auditorium, Morrisville,
NC |
| |
Mech. Eng.: |
The Wooden Company |
| |
C | |