Top Bar - M & I Air Systems, heating and ventilation
M & I Logo - M & I Air Systems Engineering
Corporate Profile - M & I Air Systems Engineering
Client List - M & I Air Systems Engineering Case Studies - M & I Air Systems EngineeringContact Info - M & I Air Systems EngineeringProducts - M & I Air Systems Engineering
Research & Development - M & I Air Systems Engineering
Home Page - M & I Air Systems Engineering

 

M & I AIR MIXER | M & I AIR VALVE | M&I COLUMN FAN/COMPUTER ROOM AIR CONDITIONER
M&I COMPAC SPACE FAN SYSTEM
| M&I WHISPER-AIR FAN SYSTEM | M&I INDUCTION UNIT

This is a partial list of some of our clients who are using air handling and distribution systems designed and manufactured by M & I Air Aystems.

M & I AIR MIXER

PARTIAL INSTALLATION LIST

1. Project: University of Michigan Hospital, Ann Arbor, MI
  Mech. Eng.: John E. Green
  Capacity: 28,000 cfm

2. Project: Nashville Public Library, Nashville, TN
  Mech. Eng.: I.C. Thomason
  Capacity: One 94,465 cfm and One 124,200 cfm

3. Project: Progressive Campus II, Cleveland, OH
  Mech. Eng.: The Whiting-Turner
  Capacity: Two 90,000 cfm each

4. Project: Providence Hospital, Anchorage, AK
  Mech. Eng.: Coffman Engineer
  Capacity: One 110,000 cfm and one 65,000 cfm

M & I AIR VALVE

1. Project: Rutger University, Denville, NJ
  Mech. Eng.: Kallen & Lemelson, NY

2. Project: University of Iowa, IA; Chemistry & Botany Bldg.
  Mech. Eng.: KJWW Eng. Consultants, Rock Island, IL

3. Project: Imperial Chemical Company, England
  Customer: Ensertec Systems International Ltd.

4. Project: Motorola Inc., AZ
  Mech. Eng.: Beu-Math Engineers

5. Project: Crete Monee School, IL
  Mech. Eng.: J.L.S. Consulting Services

6. Project: Shelter Insurance Co., MO
  Customer: Econair Inc.

7. Project: Wyeth Lab, NJ
  Customer: R.H. Morris & Associates

8. Project: W.R. Grace, Maryland
  Customer: The Dexter Company

9. Project: Medical Biological Research Lab, Fort Dietrick, MD
  Mech. Eng.: U.S.A. Government

10. Project: Wellman Inc., SC
  Customer: Stipp & Powell

11. Project: Henkel Lab, NJ
  Customer: Steve Mucha Inc.

12. Project: General Dynamics
  Customer: Marshall/TRIM-Aire

13. Project: Iomega, Salt Lake City, UT
  Customer: Sabol & Rice Inc.

14. Project: J.H. Kawa Sake Motors
  Customer: Air Conditioning Special

15. Project: Rutger University, NJ
  Customer: R.H. Morris

16. Project: Shelter Insurance Co., MO
  Customer: Econair Inc.

17. Project: Westwood Hospital, CA
  Customer: Air Conditioning Spec. Comp.

18. Project: Congress Centre
  Customer: Thermo Dynamics Inc.

19. Project: E.M Diagnostics, NJ
  Customer: Harris Environmental Systems

20. Project: Washington University, MO
  Customer: C&R Heating & Services Co

21. Project: Westwood Hospital, CA
  Customer: Imperial Air Conditioning

22. Project: Crete Monee High School, IL
  Customer: Havel Brothers Inc.

23. Project: Plymouth Vocational High School, MA
  Customer: Worcester Air Conditioning Co. Inc.

24. Project: Bill Moore, FL
  Customer: Harlow & Associates

25. Project: Motorola, AZ
  Customer: Pacific Air Reps

26. Project: Maurice-Lamontagne Lab. Institutes, PQ
  Customer: Tranchair J.F. Inc.

27. Project: Sussex Place, ON
  Mech. Eng: Smylie & Crow Associates

28. Project: Nashville Convention Centre, TN
  Customer: Smith Seckmen Reid Inc., TN

29. Project: University of Michigan (Laboratory)
  Customer: Phoenix Controls Corporation

30. Project: Boston University, MA
  Customer: Leonard F. Luchner, Inc.

31. Project: Animal Disease Diagnostic Laboratory, IN
  Customer: Havel Bros. Inc.

32. Project: Sandoz Pharmaceutical, NJ
  Customer: Monsen Engineering Co.

33. Project: Flow Safe Control, NJ
  Customer: Through Flow Safe Control, M&I have supplied air valves to more than 50 laboratory fume hood projects.

M&I COLUMN FAN/COMPUTER ROOM AIR CONDITIONER

PARTIAL INSTALLATION LIST

1. Project: Woodfield Preserve Office Center, Chicago, IL
  Mech. Eng.: ESD
  Capacity: Twenty Four (24) 10,000 cfm

2. Project: Pine Meadows Corporate Center, Liberville, IL
  Mech. Eng.: ESD
  Capacity: Twenty Four (24) 10,000 cfm

3. Project: US West Main - 10th Floor, Denver, CO
  Mech. Eng.: US Engineering Company
  Capacity: Four (4) 10,000 cfm & One (1) 6,100 cfm

M&I COMPAC SPACE FAN SYSTEM

PARTIAL INSTALLATION LIST

1. Project: Downers Grove Wastewater Treatment Center, IL
  Mech. Eng.: Baxter & Woodman, IL
  Capacity: Five 5,000 to 7,500 cfm exhaust

2. Project: Cincinnati Medical Arts Building, OH
  Mech. Eng.: I.C. Thomasson, TN
  Capacity: One 125,000 cfm supply

3. Project: J.J. Keller Office Building
  Mech. Eng.: Walter R. Ratai Inc., WI
  Capacity: One 90,000 cfm supply & one 81,000 cfm return

4. Project: Vanderbilt University, TN
  Mech. Eng.: Smith Seckman & Reid, TN
  Capacity: One 75,000 cfm supply & 45,000 cfm return

5. Project: Hamilton East End Police Station
  Mech. Eng.: Group 8 Engineers, Ontario
  Capacity: One 25,000 cfm supply and one 13,000 cfm supply

6. Project: Motorola Inc., (MOS 8), Austin, TX
  Mech. Eng.: Motorola Engineering
  Capacity: One 95,000 cfm supply

7. Project: Nuclear Power Plant, India
  Mech. Eng.: Indian Automatic Energy Commission
  Capacity: Sixteen 23,500 cfm and eight 13,000 cfm supply

8. Project: Centennial Hospital (Hospital Corporation of America)
  Mech. Eng.: I.C. Thomasson, TN
  Capacity: Five supply (372,000 cfm) and five return (304,000 cfm)

9. Project: Medical Research Building (Vanderbilt University)
  Mech. Eng.: Phoenix Consulting Engineers
  Capacity: Two 130,000 cfm supply and one 54,000 cfm supply

10. Project: Motorola Inc. (Disco Polyimide) Austin, TX
  Mech. Eng.: Motorola Engineering
  Capacity: Three 25,000 cfm supply

11. Project: Cyanamid/Lederle Labs (Bldg. #34), NY
  Mech. Eng.: Fletcher Thompson
  Capacity: One 18,000 cfm supply

12. Project: Motorola Inc. (D-Building) Austin, TX
  Mech. Eng.: Motorola Engineering
  Capacity: One 25,000 cfm supply

13. Project: Motorola Inc., Austin TX
  Mech. Eng.: Motorola Engineering
  Capacity: One 95,000 cfm supply

14. Project: Motorola Inc. (K-Probe), Austin, TX
  Mech. Eng.: Motorola Engineering
  Capacity: Five 25,000 cfm supply

15. Project: Library Square Parkade, Vancouver, B.C.
  Mech. Eng.: Keen Engineering
  Capacity: Three supply (27,000 cfm) and four exhaust (191,000 cfm)

16. Project: Cyanamid/Lederle Labs (Building #43), NY
  Mech. Eng.: A&J Consultants
  Capacity: One 21,600 cfm supply

17. Project: Cyanamid/Lederle Labs (Building #112), NY
  Mech. Eng.: JGS Technical Services
  Capacity: One 20,000 cfm supply

18. Project: Cyanamid/Lederle Labs (SPE-Phase 3), NY
  Mech. Eng.: GS&G
  Capacity: One 21,000 cfm supply

19. Project: Cyanamid/Lederle (Bldg. 43B, Chillroom 142)
  Mech. Eng.: A&J Consulting
  Capacity: One 18,000 cfm supply & 17,000 cfm return

20. Project: Library Square Parkade, Vancouver, BC
  Mech. Eng.: Keen Engineering
  Capacity: One 84,000 cfm supply

21. Project: Motorola, Austin, TX (*)
  Mech. Eng.: Motorola Engineering
  Capacity: Five 95,000 cfm supply

22. Project: Cyanamid/Lederle Labs (Building #120), NY
  Mech. Eng.: Lederle Engineering
  Capacity: One 30,000 cfm booster fan system

23. Project: IBM, Burlington, VT (*)
  Mech. Eng.: IBM Engineering
  Capacity: One 12,500 cfm return

24. Project: Maintenance Bldg., Redwood City, CA
  Mech. Eng.: Westcon Associates
  Capacity: One 12,500 cfm supply

25. Project: Newington Childrenís Hospital, CT
  Mech. Eng.: Smith Seckman Reid
  Capacity: Three supply (342,000 cfm) and three return (273,000 cfm)

26. Project: Vanderbilt Univ.-McDonalds Rest., Nashville, TN
  Mech. Eng.: Smith Seckman & Reid, TN
  Capacity: One 18,000 cfm supply

27. Project: Motorola Austin, TX (*)
  Mech. Eng.: Motorola Engineering
  Capacity: Four 25,000 cfm and two 48,000 cfm supply

28. Project: Nashville Arena, Nashville, TN
  Mech. Eng.: Smith Seckman & Reid, TN
  Capacity: Six 75,000 cfm supply and three 200,000 cfm return

29. Project: Cyanamid/Lederle Labs (Autoclave Bldg.), NY
  Mech. Eng.: A&J Consulting
  Capacity: One 3,000 cfm supply

30. Project: EMC Expansion, IA
  Mech. Eng.: Brooks Borg and Skiles
  Capacity: One 160,000 cfm supply and one 144,000 cfm return

31. Project: University of Michigan, Holden Central, MI
  Mech. Eng.: Keen Engineering
  Capacity: One 30,000 cfm supply and one 23,000 cfm return

32. Project: Roseville Hospital, CA
  Mech. Eng.: Smith Seckman Reid
  Capacity: One 138,000 cfm supply and one 97,100 cfm return

33. Project: Washington State University, WA
  Mech. Eng.: Thomas J. Gerard & Associates
  Capacity: One 75,000 cfm supply

34. Project: IBM, Burlington, VT(*)
  Mech. Eng.: Symmes, Maini & McKee Associates Inc.
  Capacity: One 50,000 cfm supply

35. Project: Merck Pharmaceutical, NJ
  Mech. Eng.: IPS
  Capacity: One 26,935 cfm supply

36. Project: Lederle Labs (Bldg. 60/60B), NY
  Mech. Eng.: Fluor Daniel
  Capacity: One 28,800 cfm supply and one 22,500 cfm return

37. Project: Motorola Inc., Austin TX (*)
  Mech. Eng.: Motorola Engineering
  Capacity: One 48,000 cfm supply

38. Project: CCMC Campus Shell, CA
  Mech. Eng.: C&B Consulting Engineers
  Capacity: Two 45,000 cfm supply

39. Project: Lederle Labs (Bldg. 211), NY
  Mech. Eng.: John Brown Engineers, NY
  Capacity: Three return (71,000 cfm) and two exhaust (50,300 cfm)

40. Project: Lederle Labs (Bldg. 211), NY
  Mech. Eng.: John Brown Engineers, NY
  Capacity: One 36,000 cfm supply and one 16,000 cfm supply

41. Project: IBM - Toshiba, Manassas, VA (*)
  Mech. Eng.: IDC Engineers, PA
  Capacity: Fifty three recirculation AHUís (1,900,000 cfm)

42. Project: Northwestern University, IL
  Mech. Eng.: -
  Capacity: Capacity : Two 58,000 cfm exhaust

43. Project: Merck & Co. Inc., PA
  Mech. Eng.: IPS Consultants
  Capacity: One 20,000 cfm supply and one 2,000 cfm supply

44. Project: Edmonds Community College, WA
  Mech. Eng.: Halverson, Beach and Bower, Inc.
  Capacity: Two 27,000 cfm supply and two 23,500 cfm return

45. Project: HCSC Blue Cross/Blue Shield, IL
  Mech. Eng.: Cosentini Associates
  Capacity: Four 174,000 cfm supply and four 145,000 cfm return

46. Project: Washington State University, WA
  Mech. Eng.: Thomas J. Gerardís Associates
  Capacity: One 75,000 cfm supply

47. Project: Princeton University, NJ
  Mech. Eng.: R.G. Vanderweil Engineers
  Capacity: One 25,000 cfm supply

48. Project: Lederle Labs, Bldg. 60 / 60B, NY
  Mech. Eng.: Fluor Daniel
  Capacity: One 31,000 supply and return, one 32,500 supply & return

49. Project: Vanderbilt University, TN
  Mech. Eng.: Smith Seckman Reid
  Capacity: One 40,000 cfm supply and 40,000 cfm return

50. Project: Kellogg Institute, MI
  Mech. Eng.: Giffels Associates
  Capacity: Three 40,000 cfm supply and one 120,000 cfm return

51. Project: Mayo Hospital, AZ
  Mech. Eng.: Phoenix Design Group
  Capacity: Seven Supply (551,200 cfm) and Seven Return (430,900 cfm

52. Project: Wyeth Lederle, PA
  Mech. Eng.: IPS Consultants
  Capacity: One 35,000 cfm supply

53. Project: Amoco Business Center, IL
  Mech. Eng.: Melvin Cohen and Associates
  Capacity: Two 120,000 cfm supply and two 120,000 cfm return

54. Project: Vitesse Fab 2, AZ (*)
  Mech. Eng.: Symmes Maini McKee Associates
  Capacity: Twelve 106,300 cfm supply

55. Project: University of Florida Brain Center, FL
  Mech. Eng.: Affiliated Engineers
  Capacity: Four supply (162,000 cfm) and one 34,000 cfm return

56. Project: Jackson Hospital, Montgomery, AL
  Mech. Eng.: Phoenix Design Group
  Capacity: One 88,900 cfm supply/return, one 71,600 supply/return

57. Project: Center For Creative Leadership, Greensboro, NC
  Mech. Eng.: Calloway Johnson Moore and West, PA
  Capacity: One 80,000 cfm supply

58. Project: Hattie B. Monroe Bldg., Omaha, NE
  Mech. Eng.: Farris Engineering
  Capacity: One 30,000 cfm supply

59. Project: Centertech, Denver, CO
  Mech. Eng.: A.B.S.
  Capacity: Two 102,500 cfm supply

60. Project: Sandia CRF, San Francisco, CA
  Mech. Eng.: Affiliated Engineers
  Capacity: Five 25,600 cfm supply and one 125,000 cfm supply

61. Project: University of Illinois, Ambulatory Care, Chicago, IL
  Mech. Eng.: Perkins and Will
  Capacity: One 140,000 cfm supply/return and one 120,000 cfm supply/return

62. Project: Motorola, Austin, TX (*)
  Mech. Eng.: Motorola Engineering
  Capacity: Two 95,000 cfm supply

63. Project: Motorola, Austin, TX (*)
  Mech. Eng.: Motorola Engineering
  Capacity: One 25,000 cfm supply

64. Project: Baptist Hospital, Nashville, TN
  Mech. Eng.: Smith Seckman Reid
  Capacity: One 140,000 cfm supply and one 120,000 cfm return

65. Project: Oriental Theater, Chicago, IL
  Mech. Eng.: Environmental Systems Design, Inc.
  Capacity: One CS-65,000 supply and one CS-34,140 cfm supply

66. Project: Library, 3rd Floor, Rochester, NY
  Mech. Eng.: Corning Engineering
  Capacity: 50,000 cfm return

67. Project: Motorola, Austin, TX (*)
  Mech. Eng.: Motorola Engineering
  Capacity: Three 95,000 cfm each

68. Project: U.C. Davis Equine Lab, San Francisco, CA
  Mech. Eng.: Affiliated Engineers
  Capacity: Two 25,000 cfm supply

69. Project: Longmont Hospital, Longmont, CO
  Mech. Eng.: Barbalata, Cordero, Espinosa, Robinson
  Capacity: Two 84,000 cfm each supply

70. Project: Corning Corporation, Corning, NY
  Mech. Eng.: Corning Corp.
  Capacity: One 50,000 cfm return

71. Project: Prime Meadows Corporation Center, Libertiville, IL
  Mech. Eng.: Wagner Heating & Ventiliating
  Capacity: Twelve 9,400 cfm units

72. Project: Sandia National Laboratories, Albuquerque, NM
  Mech. Eng.: BPLW Architects & Engineers
  Capacity: One 41,000 cfm supply

73. Project: 199 Freemont St., San Francisco, CA
  Mech. Eng.: Flack & Kurtz
  Capacity: One 35,000 cfm supply

74. Project: Gap Headquarters, San Francisco, CA
  Mech. Eng.: C&B Engineers
  Capacity: Six 85,000 cfm supply

75. Project: Lucent Technologies, Denver, CO (*)
  Mech. Eng.: Swanson Rink
  Capacity: Fifteen supply (921,500 cfm) and twelve return (511,500 cfm)

76. Project: Woodfield Preserve Office Center, Chicago, IL
  Mech. Eng.: Hill Mechanical
  Capacity: Twenty four 9,000 cfm supply

77. Project: EDD Office Building, San Francisco, CA
  Mech. Eng.: Mazzetti & Associates
  Capacity: One 64,000 cfm supply

78. Project: Baptist East-West Bedtower, Memphis, TN
  Mech. Eng.: Phoenix Design Group
  Capacity: One 77,000 cfm supply, one 32,000 cfm exhaust

79. Project: Nashville Public Library, Nashville, TN
  Mech. Eng.: I.C. Thomasson
  Capacity: Two 222,105 cfm supply and two 201,305 cfm return

80. Project: The Progressive Insurance Campus II, Cleveland, OH
  Mech. Eng.: Bacik, Karpinski Asssociates, Inc.
  Capacity: Two 90,000 cfm supply and two 90,000 cfm return

81. Project: Pier 1, San Francisco, CA
  Mech. Eng.: Flack & Kurtz
  Capacity: Four 15,000 cfm exhaust

82. Project: Edmonds Community Center, Seattle, WA
  Mech. Eng.: Nardone Mechanical
  Capacity: One 19,670 cfm supply and one 17,500 cfm return

83. Project: Bell South Marietta, Atlanta, GA
  Mech. Eng.: Johnson, Spellman & Associates, Inc.
  Capacity: Two 18,760 cfm supply

84. Project: Good Samaritan Hospital, Puyallup, WA
  Mech. Eng.: Wood/Harbinger Inc.
  Capacity: Two 40,000 cfm supply and two 40,000 cfm return

85. Project: Cornell University, Ithica, New York
  Mech. Eng.: Charles Wilson Associates
  Capacity: Two 35,000 cfm exhaust

86. Project: Providence Medical Center, Anchorage, AK
  Mech. Eng.: Coffman Engineers
  Capacity: Two supply (175,000 cfm) and two return (115,000 cfm)

* Cleanroom applications - November/2000

M&I WHISPER-AIR FAN SYSTEM

PARTIAL INSTALLATION LIST

1. Project: Vanderbilt University, Nashville, TN
  Mech. Eng.: Phoenix Design Group
  Capacity: One 8,300 cfm supply and return

2. Project: Wyeth-Ayerst Labs, Marietta, PA
  Mech. Eng.: IPS
  Capacity: One 35,000 cfm return

3. Project: Oakland Arena, Oakland, CA
  Mech. Eng.: Scott Norman Mechanical Inc.
  Capacity: Four 70,000 cfm supply

4. Project: Sony Entertainment Center, San Francisco, CA
  Mech. Eng.: S.J. Engineers
  Capacity: Fourteen 15,000 cfm to 33,000 cfm relief

5. Project: UNC-G School of Music, Greensboro, N.C
  Mech. Eng.: McCracken and Lopez
  Capacity: One 23,200 cfm supply and return

6. Project: University of Michigan, Ann Arbor, MI
  Mech. Eng.: University of Michigan Engineering
  Capacity: One 30,000 cfm supply, one 45,000 cfm supply and one 60,000 cfm supply

7. Project: MEMC Electronic Materials, Inc., St. Peters, MO
  Mech. Eng.: Burns & McDonnell
  Capacity: One 42,000 cfm supply

8. Project: Department of Revenue, Minneapolis, MN
  Mech. Eng.: Hammel Green & Abrahamson Inc.
  Capacity: Four 96,000 cfm supply

9. Project: Elmhurst Memorial Hospital, Chicago, IL
  Mech. Eng.: Phoenix Design Group
  Capacity: Four 48,000 cfm supply and return

10. Project: Wright Corporation Development Lab, Ridgewood, NC
  Mech. Eng.: David Sims & Assoc.
  Capacity: One 8,500 cfm supply

11. Project: Holy Cross Health System Corp. Headquarters, South Bend, IN
  Mech. Eng.: Hammel Green and Abrahamson Inc.
  Capacity: Two 42,500 cfm supply and one 13,500 cfm supply

12. Project: : Womanís Pavillion, Florence, SC
  Mech. Eng.: -
  Capacity: Three supply / return systems with 81,800 cfm total

13. Project: Clariant Corp. Branchburg, N.J
  Mech. Eng.: Foster Wheeler
  Capacity: One 10,000 cfm supply

14. Project: NIH NMR Addition, Washington, DC
  Mech. Eng.: RMF
  Capacity: Two 15,000 cfm supply

15. Project: Atlanta Arena, Atlanta, GA
  Mech. Eng.: M-E Engineers
  Capacity: Two 99,000 cfm supply and two 81,000 cfm supply

16. Project: Limestone Meadowbrook, Syracuse, N.Y.
  Mech. Eng.: Limestone Meadowbrook
  Capacity: One 14,000 cfm supply

17. Project: Nelson Hall, Durham, NC
  Mech. Eng.: Davis Campus Architects & Engineers
  Capacity: 9,000 cfm supply

18. Project: Institute of Genomic Research, Rockville, MD
  Mech. Eng.: RMF
  Capacity: One 50,000 cfm supply

19. Project: Institute of Genomic Research, Rockville, MD
  Mech. Eng.: RMF Engineering
  Capacity: Four supply systems (11,000 cfm to 15,000 cfm ea.)

20. Project: Nations Bank
  Mech. Eng.: Columbia Mechanical
  Capacity: One 7,000 cfm supply

21. Project: DLJ, 36th Floor, New York, NY
  Mech. Eng.: Cosentini Associates
  Capacity: One 17,500 systems

22. Project: Clariant Corp. Branchburg, N.J
  Mech. Eng.: Foster Wheeler
  Capacity: One 10,000 cfm supply

23. Project: Jordan Valley Hospital, Salt Lake City, UT
  Mech. Eng.: ESCO Mechanical & Electrical
  Capacity: Five systems with 83,000 cfm total capacity

24. Project: New York Hospital, Hicksville, NY
  Mech. Eng.: CIMA Group
  Capacity: One 36,800 cfm supply

25. Project: DLJ, 43rd Floor, New York, NY
  Mech. Eng.: Cosentini Associates
  Capacity: One 17,500 cfm supply

26. Project: Memorial Auditorium, Morrisville, NC
  Mech. Eng.: The Wooden Company
  C